|
NO
|
PROFESION
|
NAIN
|
VERB 1
|
VERB 2
|
VERB 3
|
|
1
|
Mechanical ( Mekanik)
|
Tespen
(tespen)
|
Assemble (Merakit)
|
Assembled
|
Assembled
|
|
2
|
Programe (Pemogram)
|
Computer (Komputer)
|
Programe(program)
|
Programed
|
Programed
|
|
3
|
Lecturers (Dosen)
|
Pen (Pulpen)
|
Educate (Mengajar)
|
Educated
|
Educated
|
|
4
|
Technician (Teknisi)
|
Cable (Kabel)
|
Repair (Perbaikan)
|
Repaired
|
Repaired
|
|
5
|
Mining (Pertambangan)
|
Cable (Kabel)
|
Repair (Perbaikan)
|
Repaired
|
Repaired
|
|
6
|
Enterprenuer (Wieausaha)
|
Solder (Solder)
|
Connect (Menyambung)
|
Connected
|
Connected
|
|
7
|
Telcom (Telekomunikasi)
|
Computer (Komputer)
|
Pass on (Menyampaikan)
|
Pass onned
|
Pass onned
|
|
8
|
Construction ( Kontruksi)
|
Pen (Pulpen)
|
Design (Merancang)
|
Designed
|
Designed
|
|
9
|
Civil Servent (PNS)
|
Computer (Komputer)
|
Arrange (Mengatur)
|
Arranged
|
Arranged
|
|
10
|
Electrical (Kelistrikan)
|
Cable (Kabel)
|
Repair (Perbaikan)
|
Repaired
|
Repaired
|
|
11
|
Maintenance (Memelihara)
|
Computer (Komputer)
|
Tell (Memberitahu)
|
Telled
|
Telled
|
|
12
|
Manufacturing (Manufaktur)
|
Computer (Komputer)
|
Sell (Menjual)
|
Selled
|
Selled
|
Kamis, 25 Januari 2018
Langganan:
Posting Komentar (Atom)
4th English Meeting
Today Mr. Zul absent again because he's so busy and Ms. Rella who's replace him. Finally we met again Ms, after finish exam 1st seme...
-
Thursday 11 january 2018 The 15th meeting of the English language course today ms rella continues the group that has not progressed, after ...
-
This Friday (January 26, 2018) is the sixteenth meeting. Today I am UAS. The supervisor is Miss Rella. UAS is just like the lattice discusse...
Tidak ada komentar:
Posting Komentar